Construction of industrial park (house-building combine, manufacture fuel pallets, manufacture of building mechanisms and equipments, assembly of furniture with varnishing and painting)

Basic information about ground area
The planned use of land Construction of industrial park (house-building combine, manufacture fuel pallets, manufacture of building mechanisms and equipments, assembly of furniture with varnishing and painting)
Location of the project Kushchevskiy district
Address of the location Krasnodar territory, area Kushchevsky, item Kuschevskaya, Chernomorka Str., ¹50
Cadastral number of quarter 23:17:14 04 001:81
Area of the declared (ì2) 100000
Category of the earths The Earth of settlements - for accommodation of industrial park
Kind of permitted use Zone of enterprises V of a class of harm/ Enterprises V of a class of harm of a various structure
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation General plan Kuschevskaya of rural settlement with reference to a part of territory item Kuschevskaya, approved by the decision of Advice of municipal formation area Kushchevsky from 7/24/2007 ¹ 524, Rules of land tenure and building of municipal for
Information about the proprietor (legal owner) of the ground area
Proprietor The municipal property
Legal owner of municipal formation area Kushchevsky
Kind of rights The certificate on the state registration of the right ¹709565 from 30.03.2009
Information about burden
Kind of burden, restrictions observance of a sanitary-protective zone 300ì from a housing estate, on a site there passes a waterpipe (a security zone on 5ì from an axis), high-voltage line HL of 10 kV (a security zone on 10ì from an extreme wire), the pressure head water drain (
Area of burden 12160 m2
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply HL-10 êV 800
Gas supply 225mm 300
Water supply 100mm 400
Water drain 300mm 10
Installation of telephones construction of cable line 20õ2õ0,5 2000
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 55,0
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Kuschevskaya 1
Center of the subject of federation Krasnodar 232
Highways (regional, federal value) Federal motorway Ì-4 \"Don\" 12
Highways of local value «Kuschevskaya-Starominskaya» 4
The nearest railway station Kuschevka 4
Nearest tracks 0,3
Airport Rostov-on-Don 92
Seaport Eysk 112
The additional information about ground area
Special conditions Air temperature - average annual - +9,1 ° W, max - +42°Ñ, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of win
Cost of rent/repayment of ground area (million rubles) 3,4
Notes -