Industrial production

Basic information about ground area
The planned use of land Industrial production
Location of the project Krimskiy district
Address of the location Troitsk rural settlement, the item Troitsk, section 11 a part of a contour 9
Cadastral number of quarter 23:15:05:005
Area of the declared (ì2) 70000
Category of the earths The earths of settlements
Kind of permitted use Under industrial production
Actual use It is not used
Availability of buildings, structures, constructions No
Authorizations, urban planning documentation The town-planning conclusion from06/05/2010 ¹ 58. Settlement administration.
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Under the authority of settlement
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply PS Troitcki vodozabor vl 110 kV 2500
Gas supply Gas pipeline of average pressure D70 to 2000m3/h 100
Water supply Water supply system in the item Troitsk D100 to 21m3/h 1250
Water drain No, the device of the independent water drain No
Installation of telephones No, a telephone system in the item Troitsk 500
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) After preparation of the design-budget documentation on building of an engineering infrastructure.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union G.Krymsk 30
Center of the subject of federation G.Krasnodar 70
Highways (regional, federal value) Line Krymsk-slavjansk-on-kubani 3
Highways of local value Continuation of streets of the item Troitsk 0,1
The nearest railway station The item Krymsk 30
Nearest tracks Branch Novorossisk-Krasnodar 0,3
Airport G.Krasnodar 70
Seaport G.Novorossijsk 80
The additional information about ground area
Special conditions No
Cost of rent/repayment of ground area (million rubles) 0,17/0,06
Notes 20