Building of object of agricultural purpose

Basic information about ground area
The planned use of land Building of object of agricultural purpose
Location of the project Krimskiy district
Address of the location Suburban rural settlement, the western part Semencovka (s.28, c. 43)
Cadastral number of quarter It is not appropriated
Area of the declared (м2) 170000
Category of the earths The earths of settlements
Kind of permitted use Under the agricultural enterprise
Actual use Pasture
Availability of buildings, structures, constructions The site is free from building
Authorizations, urban planning documentation The town-planning conclusion from 5/4/2010 №59. Administration of rural settlement
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Under the authority of Suburban rural settlement
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply PS Krymskay 110kV 4500
Gas supply No No
Water supply No, it is necessary chinks artesian (springs) Underground springs on a site
Water drain No, the device of cesspools is necessary No
Installation of telephones No, building of the cable water drain is necessary or to be connected in s. Armenian 2500
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) After preparation of the design-budget documentation on building of an engineering infrastructure.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Krymsk 13
Center of the subject of federation The city of Krasnodar 95
Highways (regional, federal value) Krasnodar-Novorossisk 8,5
Highways of local value Roads поселкового values 0
The nearest railway station Station Krymsk 10
Nearest tracks Krasnodar-Novorossisk 7
Airport Krasnodar 125
Seaport Novorossisk 55
The additional information about ground area
Special conditions Relief sredne-hilly, seismicity - 8
Cost of rent/repayment of ground area (million rubles) 0,0005/0,31
Notes 19