Building of miniprocessing manufacture

Basic information about ground area
The planned use of land Building of miniprocessing manufacture
Location of the project Krimskiy district
Address of the location Suburban rural settlement. A new Ukrainian, 300m to the northwest from street of Oil industry workers
Cadastral number of quarter It is not appropriated
Area of the declared (ì2) 35000
Category of the earths The earths of settlements
Kind of permitted use Under manufacture
Actual use It is not used
Availability of buildings, structures, constructions The site is free from building
Authorizations, urban planning documentation The town-planning conclusion from 5/4/2010 ¹60. Administration of rural settlement
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Under the authority of Suburban rural settlement
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply PS 110/35/10 kV 300
Gas supply D-50mm to 2000 v3/h 2250
Water supply No, drilling of a chink artesian is necessary No
Water drain No, the device of cesspools is necessary No
Installation of telephones Is available. A new Ukrainian 300
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) After preparation of the design-budget documentation on building of an engineering infrastructure.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Krymsk 7
Center of the subject of federation The city of Krasnodar 90
Highways (regional, federal value) Krasnodar-Novorossisk 0,6
Highways of local value Roads values 0
The nearest railway station Station Krymsk 5
Nearest tracks Krasnodar-Novorossisk 0,2
Airport Krasnodar 120
Seaport Novorossisk 50
The additional information about ground area
Special conditions Relief quiet, seismicity — 8 points, close ground waters
Cost of rent/repayment of ground area (million rubles) 0,08/1,07
Notes 18