The industrial enterprise

Basic information about ground area
The planned use of land The industrial enterprise
Location of the project Krimskiy district
Address of the location Suburban rural settlement. A new Ukrainian, road on village Merchansky, before Ry moving, on the right
Cadastral number of quarter It is not appropriated
Area of the declared (м2) 50000
Category of the earths The earths of settlements
Kind of permitted use Under the industrial enterprise
Actual use Pasture
Availability of buildings, structures, constructions The site is free from building
Authorizations, urban planning documentation The town-planning conclusion from 5/4/2010 №58. Administration of rural settlement
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Under the authority of Suburban rural settlement
Kind of rights -
Information about burden
Kind of burden, restrictions No
Area of burden No
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply VL 35 kV, PS Novoukrainskay 750
Gas supply Krasnodar-Krymsk D500 3500
Water supply No, drilling of an artesian chink is necessary No
Water drain No, the device of cesspools is necessary No
Installation of telephones Existing line in. A new Ukrainian 1000
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) After preparation of the design-budget documentation on building of an engineering infrastructure.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Krymsk 9
Center of the subject of federation The city of Krasnodar 90
Highways (regional, federal value) Krasnodar-Novorossisk 0,7
Highways of local value Roads поселкового values 0
The nearest railway station Station Krymsk 6
Nearest tracks Krasnodar-Novorossisk 1
Airport Krasnodar 120
Seaport Novorossisk 50
The additional information about ground area
Special conditions Relief quiet, seismicity – 8
Cost of rent/repayment of ground area (million rubles) 0,11/1,12
Notes 17