Basic information about ground area |
The planned use of land |
Building habitation |
Location of the project |
Krimskiy district |
Address of the location |
The Kiev rural settlement (between street Soviet and street Red from South side from street Miner\'s) |
Cadastral number of quarter |
collective farm «Lenin way» |
Area of the declared (ì2) |
89000 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
Under habitation |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
The site is free from building |
Authorizations, urban planning documentation |
The town-planning conclusion from 5/6/2010 ¹27. Administration of rural settlement |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Under the authority of the Kiev rural settlement |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
Is absent on a platform |
PS 35/10 kV «the Lenin way» 6750 |
Gas supply |
Is absent on a platform |
Gas pipeline from GRS Kiev, D-500 - 250 |
Water supply |
No, drilling of chinks is recommended |
No |
Water drain |
No, building of the local water drain |
No |
Installation of telephones |
No, automatic telephone exchange building |
No |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
After granting in services the design-budget documentation on building of engineering communications |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Krymsk |
16 |
Center of the subject of federation |
The city of Krasnodar |
118 |
Highways (regional, federal value) |
Krymsk-Dzhiginka |
0,8 |
Highways of local value |
õ. Lvov |
0,8 |
The nearest railway station |
Station Kiev |
1 |
Nearest tracks |
Ry on the city-resort of Anapa |
0,8 |
Airport |
Anapa |
55 |
Seaport |
Novorossisk |
90 |
The additional information about ground area |
Special conditions |
No |
Cost of rent/repayment of ground area (million rubles) |
0,13/1,24 |
Notes |
11 |