Basic information about ground area |
The planned use of land |
Open-cast mine sandy |
Location of the project |
Krimskiy district |
Address of the location |
Keslerovsky ñ/ï, õ. Pavlovsk, section 27, a part of a contour 2 |
Cadastral number of quarter |
23:15:03 14001 |
Area of the declared (ì2) |
15000 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
Under an open-cast mine sandy |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No |
Authorizations, urban planning documentation |
The town-planning conclusion from 28.05.2010___ ¹ _8_. Settlement administration. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Under the authority of settlement |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
No to pull to PS Adagumsky 35 kV |
250 |
Gas supply |
In õ. Pavlovsk a network, Dm-70 till 2000 m3/hour |
250 |
Water supply |
No to pull to õ. Pavlovsk, Du-50mm till 21 m3/hour |
250 |
Water drain |
No, the device of the independent water drain |
No |
Installation of telephones |
No |
õ. Pavlovsk 250 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
After granting in services the design-budget documentation on building of engineering communications |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Krymsk |
27 |
Center of the subject of federation |
The city of Krasnodar |
127 |
Highways (regional, federal value) |
Line of Krymsk-Dzhiginka |
1,3 |
Highways of local value |
Internal roads |
No |
The nearest railway station |
The item Kiev |
4 |
Nearest tracks |
The item Varenikovsky, Ry to Anapa |
0,8 |
Airport |
G.Anapa |
60 |
Seaport |
G.Novorossijsk |
95 |
The additional information about ground area |
Special conditions |
No |
Cost of rent/repayment of ground area (million rubles) |
0,01/0,01 |
Notes |
9 |