Basic information about ground area |
The planned use of land |
Building of a complex housing estate |
Location of the project |
Krimskiy district |
Address of the location |
The Crimean area, Adagumsky rural settlement, section 8 a contour 11 |
Cadastral number of quarter |
It is not appropriated |
Area of the declared (ì2) |
419000 |
Category of the earths |
The earths of agricultural purpose |
Kind of permitted use |
For agricultural purpose |
Actual use |
Kitchen garden |
Availability of buildings, structures, constructions |
The site is free from building |
Authorizations, urban planning documentation |
¹21 from 20/05/2010y. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
The obshchedolevaja property of citizens of former collective farm \"Southern\" |
Legal owner |
Shareholders |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
PS 110/35 kV Varenikovsky. |
250 m |
Gas supply |
Äì-70 Till 2000 m3/hour |
30 m to Zemledelcev |
Water supply |
Äó-100ìì, till 21 m3/hour |
70 m to Zemledelcev |
Water drain |
No. |
70 m to Adagum |
Installation of telephones |
ATS from 30 m to Lenina |
30 m to Lenina |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
After granting in services the design-budget documentation on building of engineering communications |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Krymsk |
37 |
Center of the subject of federation |
The city of Krasnodar |
147 |
Highways (regional, federal value) |
à/ä Krymsk-Dzhiginka |
0,04 |
Highways of local value |
Poselkovye roads |
0 |
The nearest railway station |
The item Crimean |
3 |
Nearest tracks |
Krymsk-port caucasus |
0,15 |
Airport |
Anapa |
40 |
Seaport |
Novorossisk |
60 |
The additional information about ground area |
Special conditions |
No |
Cost of rent/repayment of ground area (million rubles) |
0,38/2,55 |
Notes |
5 |