Basic information about ground area |
The planned use of land |
Construction engineering building |
Location of the project |
Krimskiy district |
Address of the location |
The Krymsk city settlement, the city of Krymsk, street Tamansky |
Cadastral number of quarter |
23:45:0101 240 |
Area of the declared (ì2) |
15000 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
2-3 many-storeyed housing estate |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
The site is free from building |
Authorizations, urban planning documentation |
The town-planning conclusion from_4.05.2010 ¹ 108. Administration of city settlement. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Under the authority of the Krymsk city settlement |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
No |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
VL 10 kV KP-2, building GKTP -100 kVA, site LEP-10 kV, LEP-0,4 kV to object is necessary. |
1000 |
Gas supply |
No, connection is possible under condition of a rerun of an elevated gas pipeline of low pressure of Dm-100 from Open Society Gorelektroseti territory» |
700 |
Water supply |
No, connection is possible from waterpipe D-200 pressure of 2,8 kg/sm2, water supply limits are not solved, reconstruction of waterpipe D400 from street Fadeeva, 139 to street Tamansky is required. |
850 |
Water drain |
There is an existing sewer network from pipes D 900 mm on street Tamansky |
700 |
Installation of telephones |
No, building of the cable water drain of 0,5 km with installation KKS-2-10, from automatic telephone exchange-52 ( is necessary. Zhukov) a lining of cable TPP 3 200õ2-1,38 km; 3 50õ2-0,3; 3 30õ2-0,6; 3 20õ2-0,6 km; 3 10õ2-1,2; installation 300-1; 10õ2-10; 10õ2-10 piece (150 numbers). |
650 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
After preparation of the design-budget documentation on building of an engineering infrastructure |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Krymsk |
0 |
Center of the subject of federation |
The city of Krasnodar |
100 |
Highways (regional, federal value) |
No |
No |
Highways of local value |
Local roads |
No |
The nearest railway station |
Station Krymsk |
5 |
Nearest tracks |
Ry ways |
2,9 |
Airport |
Anapa |
75 |
Seaport |
Novorossisk |
50 |
The additional information about ground area |
Special conditions |
Seismicity of 8 points |
Cost of rent/repayment of ground area (million rubles) |
0,2/0,23 |
Notes |
3 |