Building 5 floor 80 room apartment houses

Basic information about ground area
The planned use of land Building 5 floor 80 room apartment houses
Location of the project Krimskiy district
Address of the location The Krymsk city settlement, street Kurgannaja
Cadastral number of quarter 23:45:0101 253
Area of the declared (ì2) 5000
Category of the earths The earths of settlements
Kind of permitted use Under a many-storeyed housing estate
Actual use It is not used
Availability of buildings, structures, constructions The site is free from building
Authorizations, urban planning documentation The town-planning conclusion from 04.05.2010 ¹ 106. Administration of city settlement.
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Under the authority of the Krymsk city settlement
Kind of rights -
Information about burden
Kind of burden, restrictions Existing water drain D400
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply From VL-6 kV PR-1, building GKTP-160 kVA, site VL-6kV, LEP — 0,4 sq. 500
Gas supply Gas pipeline of low pressure of Dm-100 on street Kurgannoj, installation 1500
Water supply Waterpipe on street Kurgannoj D-150, pressure of 2,0 kg/sm2 1500
Water drain Existing water drain D-300 on street Kurgannaja 1500
Installation of telephones The lining of cable TPP 3 100õ2-1,1 km is necessary. 50Õ2-0,1 km, 30õ2-0,1êì, 10õ2-0,2 km installation R-300-1, KRT 10õ2-8. 1500
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) After granting in services the design-budget documentation on building of engineering communications
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Krymsk 0
Center of the subject of federation The city of Krasnodar 100
Highways (regional, federal value) No No
Highways of local value No No
The nearest railway station Station Krymsk 2,5
Nearest tracks Ry ways 2,1
Airport Anapa 75
Seaport Novorossisk 50
The additional information about ground area
Special conditions Seismicity of 8 points
Cost of rent/repayment of ground area (million rubles) 0,06/1,88
Notes 2