Basic information about ground area |
The planned use of land |
Hotel on 20 places |
Location of the project |
Krylovsky district |
Address of the location |
Krylovskiy region, FAD \"Don\" km 1178+400 (on the right) |
Cadastral number of quarter |
23:14:05 01 003 |
Area of the declared (м2) |
1500 |
Category of the earths |
Land of the populated points |
Kind of permitted use |
For accomodation and usages of the hotel on 20places |
Actual use |
Not used |
Availability of buildings, structures, constructions |
Free from buildings |
Authorizations, urban planning documentation |
General plan, combined with project of the planning (in shortened volume) of the centre of the wayside service on superhighways \"Don\" in Krylovskom region Krasnodarskogo edges (resolution chapters MO Krylovskiy region from 30.11.2005 726) |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
\"state property\" |
Legal owner |
Municipal formation Krylovskiy region |
Kind of rights |
Not registered |
Information about burden |
Kind of burden, restrictions |
are absent |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
400 kVT/10KV |
before 50 m |
Gas supply |
диам. 159 mms |
before 250 m |
Water supply |
диам. 100, 1,8 atm |
before 30m |
Water drain |
Local buildings |
|
Installation of telephones |
диам. 100 |
Before 30 m |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
3.5 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
St. Krylovskaya |
15 |
Center of the subject of federation |
city Krasnodar |
180 |
Highways (regional, federal value) |
St. Krylovskaya |
0 |
Highways of local value |
cl. October |
2 |
The nearest railway station |
cl. October |
0 |
Nearest tracks |
cl. October |
0 |
Airport |
Rostov-on- Don |
120 |
Seaport |
Novorossiysk |
350 |
The additional information about ground area |
Special conditions |
a Relief of the area (krutizna. direction of the declivity): calm; - A Water table: 6 - 7 m.; - Dominating direction winds: east, northeasterly; - Seysmichnosti: before 6 баллов |
Cost of rent/repayment of ground area (million rubles) |
0,009 |