Location of manufacturing solar collectors

Basic information about ground area
The planned use of land Location of manufacturing solar collectors
Location of the project Krasnoarmejskiy district
Address of the location Krasnoarmeysky district, village Poltava industrial zone construction for industrial enterprises
Cadastral number of quarter 23:13:12 02 000
Area of the declared (ì2) 30 600
Category of the earths Land settlements
Kind of permitted use To accommodate the plant for production of solar collectors
Actual use Agricultural production
Availability of buildings, structures, constructions There are no
Authorizations, urban planning documentation Urban rural settlements of the Poltava 02 July 2010 No. 12
Information about the proprietor (legal owner) of the ground area
Proprietor Russian Federation
Legal owner Administration Krasnoarmeysky district
Kind of rights Not registered
Information about burden
Kind of burden, restrictions There are no
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply ÂË 10 êÂò, existing electric networks 50
Gas supply Existing street network 1500
Water supply Drilling artesian wells 0,05
Water drain Existing sewage installations of Poltava baby 100
Installation of telephones Existing street network 1500
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply: 0,268 Power supply: 0,105 Gas supply: 0,635 Sewerage: 0,165
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Poltavskaya village 1,2
Center of the subject of federation Krasnodar 70
Highways (regional, federal value) Temriuk-Krasnodar-Kropotkin 7
Highways of local value street Centralnaya 1
The nearest railway station Poltavskaya station 3,3
Nearest tracks Poltavskaya station 3,3
Airport Krasnodar 100
Seaport Novorossiysk 100
The additional information about ground area
Special conditions The site is located in an industrial zone building calendar Poltava. Topography of the land area is even planned. Groundwater level 1.5, availability of exogenous processes. Seismicity of the area on the map of seismic microzonation methods 7 points. Dominant wind direction North-East. Mean annual air temperature + 10.9, maximum + 40 ° c, minimum-36
Cost of rent/repayment of ground area (million rubles) 0,189/0,249
Notes -