Basic information about ground area |
The planned use of land |
Location of the housing estate “Moskovsky” |
Location of the project |
Krasnoarmejskiy district |
Address of the location |
Novomyshastovskaya village, Sovetskaya Street 8 “A”, 8 “B” |
Cadastral number of quarter |
23:13:0901202:44; 23:13:0901236:41; 23:13:0901239:15; 23:13:0901240:23; 23:13:0901181:28; 23:13:0901181:29 |
Area of the declared (ì2) |
415 656 |
Category of the earths |
Settlement acres |
Kind of permitted use |
For location of a housing estate |
Actual use |
Posture |
Availability of buildings, structures, constructions |
None |
Authorizations, urban planning documentation |
Town-planning dated by 29.04.2010, ¹ 59 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Russian Federation |
Legal owner |
Administration Krasnoarmeysky district |
Kind of rights |
Not registered |
Information about burden |
Kind of burden, restrictions |
The plot is restricted and burdened with the rights of the public corporation “Kubanenergo” of unimpeded thoroughfare and repair |
Area of burden |
3091 sq.m. |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
existing power networks – 50m. VL-10 kV substations 110/10 “Novomyshastovskaya” |
50 |
Gas supply |
existing street gas supply networks |
100 |
Water supply |
existing street water supply networks 100 m. Well point drilling with output not more than 25 m³ per hour. Free mains pressure 2 atmosphere |
100 |
Water drain |
watertight stinking fund |
- |
Installation of telephones |
existing street networks |
50 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
Water supply: 0,2 Sewage: not available: individual Power supply: 0,83 Heat supply: not required Gas supply: 0,15 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Poltavskaya village |
41 |
Center of the subject of federation |
Krasnodar |
25 |
Highways (regional, federal value) |
Temriuk-Krasnodar-Kropotkin |
1 |
Highways of local value |
Novomyshastovskaya village |
1 |
The nearest railway station |
Poltavskaya station |
42 |
Nearest tracks |
Poltavskaya station |
42 |
Airport |
Krasnodar |
50 |
Seaport |
Temrijuk Novorossiysk |
110 140 |
The additional information about ground area |
Special conditions |
Plot relief is even, sited. Groundwater level is 1.2, no exogenous processes have been determined. District seismicity level is intensity 7 according to the seismic risk zoning plan. Prevailing wind direction is north-east. Air temperature is as follows: average annual +10,9 Ñ, maximum +40 Ñ, minimum -36 Ñ. |
Cost of rent/repayment of ground area (million rubles) |
0,7. |