Building of many-stored settlements with wharfs and bank protection

Basic information about ground area
The planned use of land Building of many-stored settlements with wharfs and bank protection
Location of the project Krasnodar city
Address of the location Kurortnaya , 3 street, Korosunskyi inner-city district.
Cadastral number of quarter 23:43:0000000:334
Area of the declared (ì2) 23084
Category of the earths Land of settlement
Kind of permitted use Building of many-storied settlements with bank pro-tection relates to the main type of permitted using of zone Æ .2.
Actual use Not used
Availability of buildings, structures, constructions none
Authorizations, urban planning documentation The decision of Krasnodar city Duma dated 30.01.2007 ¹ 19 clause 6 “About adoption of regula-tions of land tenure and building”, with changes of the decision dated 10.04.2008 ¹ 40 clause 1, dated 26.02.2009 ¹ 53 clause9 and dated 24.09.2009 ¹ 61 clause.7
Information about the proprietor (legal owner) of the ground area
Proprietor The right is not registed
Legal owner Administration of the Krasnodar edge
Kind of rights Disposition
Information about burden
Kind of burden, restrictions It is necessary to make project of bank protection of Karasun right site and coordinate in accordance with established order.
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply 210 kw 300
Gas supply 463 m3/ hour 700
Water supply 150 m3/ 24hours. 700
Water drain 150 m3/ 24hours. 700
Installation of telephones 176 numbers
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 11,520
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Krasnodar city 10
Center of the subject of federation Krasnodar city 10
Highways (regional, federal value) 2 2
Highways of local value 0 3
The nearest railway station Krasnodar - 1 20
Nearest tracks 10
Airport 5
Seaport Novorossiysk city 150
The additional information about ground area
Special conditions It is necessary to make project of bank protection of Karasun right site and coordinate in accordance with established order.
Cost of rent/repayment of ground area (million rubles) Estimation is required.
Notes Rent is provided on terms of auction.