Basic information about ground area |
The planned use of land |
Multy-storey residential housing. |
Location of the project |
Krasnodar city |
Address of the location |
6, V. Gassiya street, Karasunsky city district. |
Cadastral number of quarter |
23:43:0427001:68 |
Area of the declared (ì2) |
135057 |
Category of the earths |
Land of settlement |
Kind of permitted use |
Placing of multy-storey residential housing conforms to main type of permitted use of zone Æ.2. |
Actual use |
Not used |
Availability of buildings, structures, constructions |
none |
Authorizations, urban planning documentation |
The decision of Krasnodar city Duma dated 30.01.2007 ¹ 19 clause 6 “About adoption of regulations of land tenure and building”, with changes of the decision dated 10.04.2008 ¹ 40 clause 1, dated 26.02.2009 ¹ 53 clause9 and dated 24.09.2009 ¹ 61 clause.7 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
- |
Legal owner |
- |
Kind of rights |
- |
Information about burden |
Kind of burden, restrictions |
none |
Area of burden |
none |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
2460 kw |
2000 |
Gas supply |
Not required |
- |
Water supply |
1144,0 m3/ 24hours |
1500 |
Water drain |
1144,0 m3/ 24hours |
1500 |
Installation of telephones |
990 |
2000 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
99,1 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Krasnodar city |
10 |
Center of the subject of federation |
Krasnodar city |
10 |
Highways (regional, federal value) |
2 |
2 |
Highways of local value |
0 |
0 |
The nearest railway station |
Krasnodar - 1 |
10 |
Nearest tracks |
|
10 |
Airport |
|
5 |
Seaport |
Novorossiysk city |
150 |
The additional information about ground area |
Special conditions |
Main geotechnical seismological characteristic of the plot. |
Cost of rent/repayment of ground area (million rubles) |
Independent estimation is required |
Notes |
Rent |