Basic information about ground area |
The planned use of land |
Workshop on production of yogurts |
Location of the project |
Korenovskiy district |
Address of the location |
Krasnodar region, Korenovskiy district, Proletarsk rural settlement, village Babich-Korenovsk,World street, 70 |
Cadastral number of quarter |
23:12:05 01 005 |
Area of the declared (ì2) |
2603 m2 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
There is no town-planning documentation |
Availability of buildings, structures, constructions |
none |
Authorizations, urban planning documentation |
The town-planning documentation of settlement is in working out |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Public domain (undifferentiated) |
Legal owner |
Administration of Proletarsk rural settlement |
Kind of rights |
The earths under the authority of Proletarsk rural settlement |
Information about burden |
Kind of burden, restrictions |
none |
Area of burden |
none |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
10êw |
20 |
Gas supply |
High pressure gas pipeline |
30 |
Water supply |
15 m3/day |
30 |
Water drain |
15 m3/day |
Small treatment facilities |
Installation of telephones |
- |
- |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,6 million rbl. |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Korenovsk City |
24 |
Center of the subject of federation |
Krasnodar City |
83 |
Highways (regional, federal value) |
Ì4 Don |
18 |
Highways of local value |
World street |
0,01 |
The nearest railway station |
Korenovsk Station |
28 |
Nearest tracks |
- |
28 |
Airport |
Airport Krasnodar |
98 |
Seaport |
Novorossisk |
274 |
The additional information about ground area |
Special conditions |
Seismicity is 7 grades |
Cost of rent/repayment of ground area (million rubles) |
0,82 |
Notes |
none |