Basic information about ground area |
The planned use of land |
Minifactory on agricultural machinery assemblage |
Location of the project |
Korenovskiy district |
Address of the location |
Krasnodar territory, Korenovsky area, the city of Korenovsk, area of sugar factory |
Cadastral number of quarter |
23:12:06 01 046 |
Area of the declared (ì2) |
50000 m2 |
Category of the earths |
Area of settlements |
Kind of permitted use |
Zone of agricultural grounds |
Actual use |
Free earths |
Availability of buildings, structures, constructions |
none |
Authorizations, urban planning documentation |
Rules of land tenure and building of Korenovsky city settlement, with reference to a part of territory of settlement — the city of Korenovsk, are confirmed by Council of Korenovsky city settlement of Korenovsky area ¹ 452 from 2.4.2009 of year. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Public domain (undifferentiated) |
Legal owner |
Administration of Korenovsky city settlement |
Kind of rights |
The earths under the authority of Korenovsky city settlement |
Information about burden |
Kind of burden, restrictions |
none |
Area of burden |
none |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
TP160kv |
600 |
Gas supply |
High pressure gas pipeline |
400 |
Water supply |
5 m3/day |
750 |
Water drain |
5 m3/day |
Small treatment facilities |
Installation of telephones |
- |
- |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
1,6 million rbl. |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Korenovsk City |
6.5 |
Center of the subject of federation |
Krasnodar City |
67 |
Highways (regional, federal value) |
Ì4 Don |
10 |
Highways of local value |
Mayakovsky\'s street |
0.3 |
The nearest railway station |
Korenovsk Station |
4 |
Nearest tracks |
- |
0.4 |
Airport |
Airport Krasnodar |
80 |
Seaport |
Novorossisk |
250 |
The additional information about ground area |
Special conditions |
Seismicity is 7 grades |
Cost of rent/repayment of ground area (million rubles) |
Rent 3,5 |
Notes |
- |