Basic information about ground area |
The planned use of land |
For placing of object of roadside service |
Location of the project |
Kanevskiy district |
Address of the location |
Krasnodar territory, Kanevsky area, the item Chelbassky, street Krasnoarmejsky, 166 |
Cadastral number of quarter |
23:11:07 01 099:0022 |
Area of the declared (ì2) |
2870 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
For building and gasoline station operation |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
No, the site is free from building |
Authorizations, urban planning documentation |
The decision of Council of Chelbassky rural settlement «About the statement of Rules of land tenure and municipal union building Chelbassky rural settlement of Kanevsky area, with reference to parts of territory of settlement – a village Chelbassky, settlement Cheerful» from 18.09.2009 ¹91; The decision of the head of municipal union Chelbassky rural settlement «About preparation of a general layout of municipal union Chelbassky rural settlement» from 17.12.2008 ¹ 264. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Kanevsky area |
Kind of rights |
Not registered |
Information about burden |
Kind of burden, restrictions |
Exacting termare not established |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
KTP 10/0,4 on street Krasnoarmejsky |
10 |
Gas supply |
Gas pipeline of low pressure on street Krasnoarmejsky |
10 |
Water supply |
Waterpipe on street Krasnoarmejsky |
10 |
Water drain |
Small treatment facilities in site territory |
- |
Installation of telephones |
Connection point on street of Komintern-40 of years of October |
30 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,35 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The item Kanevsky |
30 |
Center of the subject of federation |
The city of Krasnodar |
150 |
Highways (regional, federal value) |
Krasnodar-Yeysk |
30 |
Highways of local value |
Kanevsky- Chelbassky |
0,01 |
The nearest railway station |
The item Kanevsky |
34 |
Nearest tracks |
The item Kanevsky |
34 |
Airport |
The city of Krasnodar |
160 |
Seaport |
The city of Yeysk |
130 |
The additional information about ground area |
Special conditions |
Climate is moderate-continental. According to climatic division into districts it is zone SHB. The mid-annual amount of precipitation – 500 mm, capacity of a snow cover – 14 see According to cards of division into districts of climatic characteristics village territory concerns: - On weight of a snow cover to 1 area; - On average speed of a wind for the winter period – 5m/with - On pressure of a wind to area SH; - On monthly average temperature of air in January -5C; - On monthly average temperature of air in July - +25Ñ; - On a deviation of average temperature of air of the coldest days from monthly average temperature in January-15C. In the geomorphological relation enters into area of akkumuljativno-erosive loessial plain grunty prosadochnye also concern the first and second category. Seismicity area — 6 points. |
Cost of rent/repayment of ground area (million rubles) |
0,45 mln.rbl. |
Notes |
- |