Basic information about ground area |
The planned use of land |
Cafe building on 50 places |
Location of the project |
Kanevskiy district |
Address of the location |
Krasnodar territory, Kanevsky area, the item Kanevsky, street Tamansky |
Cadastral number of quarter |
23:11:0603024:105 |
Area of the declared (ì2) |
2000 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
For cafe building on 50 seats |
Actual use |
It is not used |
Availability of buildings, structures, constructions |
The destroyed summer cinema, a total area of 650 sq.m. |
Authorizations, urban planning documentation |
The decision of Council of Kanevsky area «About settlement town-planning documentation ÌÎ Kanevsky area» from 12/15/2005, report ¹11, item 16 The decision of Council of Kanevsky rural settlement «About the statement of Rules of land tenure and building of Kanevsky rural settlement of Kayonevsky area» from 30.12.2009 ¹20 The decision of the head municipal union Kanevsky rural settlement «About preparation a general layout municipal union Kanevsky rural settlement» from 24.12.2008 ¹ 2056 |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State property |
Legal owner |
Kanevsky area |
Kind of rights |
Not registered |
Information about burden |
Kind of burden, restrictions |
Exacting termare not established |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
Existing transmission line on street of Tamansky, 0.4 kVa |
15 |
Gas supply |
The existing underground gas pipeline of low pressure on street of Tamansky, diameter - of 130 mm. |
10 |
Water supply |
The existing waterpipe on street of Tamansky, diameter-100 of mm. |
20 |
Water drain |
The existing central water drain on street of Chernomorskaya |
20 |
Installation of telephones |
Existing communication line on street of Tamansky |
15 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,15 mln. rbl. |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The item Kanevsky |
0,01 |
Center of the subject of federation |
The city of Krasnodar |
120 |
Highways (regional, federal value) |
Krasnodar-Yeysk |
7 |
Highways of local value |
Kanevsky-Staroderevjankovsky |
0,02 |
The nearest railway station |
The item Kanevsky |
4 |
Nearest tracks |
The item Kanevsky |
4 |
Airport |
The city of Krasnodar |
135 |
Seaport |
The city of Yeysk |
100 |
The additional information about ground area |
Special conditions |
Climate is moderate-continental. According to climatic division into districts it is zone SHB. The mid-annual amount of precipitation – 500 mm, capacity of a snow cover – 14 see According to cards of division into districts of climatic characteristics village territory concerns: - On weight of a snow cover to 1 area; - On average speed of a wind for the winter period – 5m/with - On pressure of a wind to area SH; - On monthly average temperature of air in January -5C; - On monthly average temperature of air in July - +25Ñ; - On a deviation of average temperature of air of the coldest days from monthly average temperature in January-15C. In the geomorphological relation enters into area of akkumuljativno-erosive loessial plain grunty prosadochnye also concern the first and second category. Seismicity area — 6 points. |
Cost of rent/repayment of ground area (million rubles) |
0,03 mln.rbl/year |
Notes |
- |