Cafe building on 50 places

Basic information about ground area
The planned use of land Cafe building on 50 places
Location of the project Kanevskiy district
Address of the location Krasnodar territory, Kanevsky area, the item Kanevsky, street Tamansky
Cadastral number of quarter 23:11:0603024:105
Area of the declared (ì2) 2000
Category of the earths The earths of settlements
Kind of permitted use For cafe building on 50 seats
Actual use It is not used
Availability of buildings, structures, constructions The destroyed summer cinema, a total area of 650 sq.m.
Authorizations, urban planning documentation The decision of Council of Kanevsky area «About settlement town-planning documentation ÌÎ Kanevsky area» from 12/15/2005, report ¹11, item 16 The decision of Council of Kanevsky rural settlement «About the statement of Rules of land tenure and building of Kanevsky rural settlement of Kayonevsky area» from 30.12.2009 ¹20 The decision of the head municipal union Kanevsky rural settlement «About preparation a general layout municipal union Kanevsky rural settlement» from 24.12.2008 ¹ 2056
Information about the proprietor (legal owner) of the ground area
Proprietor State property
Legal owner Kanevsky area
Kind of rights Not registered
Information about burden
Kind of burden, restrictions Exacting termare not established
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply Existing transmission line on street of Tamansky, 0.4 kVa 15
Gas supply The existing underground gas pipeline of low pressure on street of Tamansky, diameter - of 130 mm. 10
Water supply The existing waterpipe on street of Tamansky, diameter-100 of mm. 20
Water drain The existing central water drain on street of Chernomorskaya 20
Installation of telephones Existing communication line on street of Tamansky 15
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 0,15 mln. rbl.
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union The item Kanevsky 0,01
Center of the subject of federation The city of Krasnodar 120
Highways (regional, federal value) Krasnodar-Yeysk 7
Highways of local value Kanevsky-Staroderevjankovsky 0,02
The nearest railway station The item Kanevsky 4
Nearest tracks The item Kanevsky 4
Airport The city of Krasnodar 135
Seaport The city of Yeysk 100
The additional information about ground area
Special conditions Climate is moderate-continental. According to climatic division into districts it is zone SHB. The mid-annual amount of precipitation – 500 mm, capacity of a snow cover – 14 see According to cards of division into districts of climatic characteristics village territory concerns: - On weight of a snow cover to 1 area; - On average speed of a wind for the winter period – 5m/with - On pressure of a wind to area SH; - On monthly average temperature of air in January -5C; - On monthly average temperature of air in July - +25Ñ; - On a deviation of average temperature of air of the coldest days from monthly average temperature in January-15C. In the geomorphological relation enters into area of akkumuljativno-erosive loessial plain grunty prosadochnye also concern the first and second category. Seismicity area — 6 points.
Cost of rent/repayment of ground area (million rubles) 0,03 mln.rbl/year
Notes -