Basic information about ground area |
The planned use of land |
Construction of a factory on manufacture of starch and treacle |
Location of the project |
Kalininskiy district |
Address of the location |
353793, Kalininsky District, northen part Starovelichkovskaya village |
Cadastral number of quarter |
23:10:06 02 196 |
Area of the declared (ì2) |
47175 |
Category of the earths |
The earths of settlements |
Kind of permitted use |
Service of manufacture |
Actual use |
Agricultural use |
Availability of buildings, structures, constructions |
no |
Authorizations, urban planning documentation |
Documents were not made |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
State ownership |
Legal owner |
Administration Municipal Formation Kalininsky District |
Kind of rights |
A state ownership before differentiation |
Information about burden |
Kind of burden, restrictions |
no |
Area of burden |
no |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
from VL-10, construction separate KTP 10/04kV |
50 |
Gas supply |
- |
- |
Water supply |
from the pipe with a section of 110 mm, water pressure – 1,6 atm |
950 |
Water drain |
Projected septic tank |
- |
Installation of telephones |
- |
- |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
0,849 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
Kalininskaya village |
42,5 |
Center of the subject of federation |
The city of Krasnodar |
105 |
Highways (regional, federal value) |
Timashevsk- Poltavskaya, Kalininskaya - Novotitarovskaya |
12,5 |
Highways of local value |
Gorodskaya street |
- |
The nearest railway station |
Station Velichkovka |
48 |
Nearest tracks |
Starovelichkovskaya village |
47,5 |
Airport |
The city of Krasnodar |
115 |
Seaport |
The city of Novorossiysk |
170 |
The additional information about ground area |
Special conditions |
Soil erosion processes are absent, seismicity - 7 balls |
Cost of rent/repayment of ground area (million rubles) |
Rent – 0,2 The repayment – 4,7 |
Notes |
- |