Construction of a factory on manufacture of starch and treacle

Basic information about ground area
The planned use of land Construction of a factory on manufacture of starch and treacle
Location of the project Kalininskiy district
Address of the location 353793, Kalininsky District, northen part Starovelichkovskaya village
Cadastral number of quarter 23:10:06 02 196
Area of the declared (ì2) 47175
Category of the earths The earths of settlements
Kind of permitted use Service of manufacture
Actual use Agricultural use
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation Documents were not made
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Administration Municipal Formation Kalininsky District
Kind of rights A state ownership before differentiation
Information about burden
Kind of burden, restrictions no
Area of burden no
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply from VL-10, construction separate KTP 10/04kV 50
Gas supply - -
Water supply from the pipe with a section of 110 mm, water pressure – 1,6 atm 950
Water drain Projected septic tank -
Installation of telephones - -
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 0,849
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Kalininskaya village 42,5
Center of the subject of federation The city of Krasnodar 105
Highways (regional, federal value) Timashevsk- Poltavskaya, Kalininskaya - Novotitarovskaya 12,5
Highways of local value Gorodskaya street -
The nearest railway station Station Velichkovka 48
Nearest tracks Starovelichkovskaya village 47,5
Airport The city of Krasnodar 115
Seaport The city of Novorossiysk 170
The additional information about ground area
Special conditions Soil erosion processes are absent, seismicity - 7 balls
Cost of rent/repayment of ground area (million rubles) Rent – 0,2 The repayment – 4,7
Notes -