Construction of the logistical center

Basic information about ground area
The planned use of land Construction of the logistical center
Location of the project Kalininskiy district
Address of the location 353793, Kalininsky District, northen part Starovelichkovskaya village
Cadastral number of quarter 23:10:06 02 196
Area of the declared (ì2) 120000
Category of the earths The earths of settlements
Kind of permitted use Service of manufacture
Actual use Agricultural use
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation Documents were not made
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Administration Municipal Formation Kalininsky District
Kind of rights A state ownership before differentiation
Information about burden
Kind of burden, restrictions On a site pass VL-35 kw and a gas main of a high pressure
Area of burden 12600 m2
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply from VL-35, VL-10, construction separate KTP 10/04kV 10
Gas supply from the pipe with a section of 325 mm, pressure – 6 atm. 10
Water supply from the pipe with a section of 110 mm, water pressure – 1,6 atm 50
Water drain Projected septic tank -
Installation of telephones - -
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 0,955
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Kalininskaya village 6
Center of the subject of federation The city of Krasnodar 65
Highways (regional, federal value) Timashevsk- Poltavskaya, Kalininskaya - Novotitarovskaya 2,5 0,075
Highways of local value Gorodskaya street 0,075
The nearest railway station Station Velichkovka 2,5
Nearest tracks Starovelichkovskaya village 1
Airport The city of Krasnodar 70
Seaport The city of Novorossisk 145
The additional information about ground area
Special conditions Soil erosion processes are absent, seismicity - 7 balls
Cost of rent/repayment of ground area (million rubles) Rent – 1,3 The repayment – 12,2
Notes -