Construction of inhabited microdistrict \"Northwest\" (2-nd and 3-rd turn of development).

Basic information about ground area
The planned use of land Construction of inhabited microdistrict \"Northwest\" (2-nd and 3-rd turn of development).
Location of the project Kalininskiy district
Address of the location 353780, Kalininsky district, Kalininskaya village, northwest suburb
Cadastral number of quarter 23:10:04 03 190
Area of the declared (ì2) 358 000
Category of the earths Lands of settlements
Kind of permitted use Type of territory – low-rise apartment blocks
Actual use Agricultural use
Availability of buildings, structures, constructions no
Authorizations, urban planning documentation Documents were not made
Information about the proprietor (legal owner) of the ground area
Proprietor State ownership
Legal owner Administration Municipal Formation Kalininsky District
Kind of rights A state ownership before differentiation
Information about burden
Kind of burden, restrictions no
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply from VL-35, VL-10, construction separate KTP 10/04kV 50
Gas supply from the pipe with a section of 219 mm, pressure – 1,2 atm. 150
Water supply from the pipe with a section of 100 mm 125
Water drain Projected septic tank -
Installation of telephones - -
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 2,544
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union Kalininskaya village 2,5
Center of the subject of federation The city of Krasnodar 75
Highways (regional, federal value) Timashevsk- Poltavskaya, Kalininskaya - Novotitarovskaya 1
Highways of local value Lenina street 0,75
The nearest railway station Station Velichkovka 7,5
Nearest tracks Starovelichkovskaya village 7
Airport The city of Krasnodar 80
Seaport The city of Novorossiysk 140
The additional information about ground area
Special conditions Soil erosion processes are absent, seismicity - 7 balls
Cost of rent/repayment of ground area (million rubles) Rent – 40,0 The repayment – 0,8
Notes -