House construction

Basic information about ground area
The planned use of land House construction
Location of the project Armavir Ñity
Address of the location Armavir,the North Caucasian experimental station WIM
Cadastral number of quarter 23:38:05 01 000
Area of the declared (ì2) 600 000
Category of the earths The grounds of an agricultural purpose. (category will be changed after the statement by Federal agency of a cadastre of objects of the real estate land management file affairs under the description of borders of Armavir).
Kind of permitted use Agricultural use (temporarily). After the statement Federal agency of cadastre of objects of the real estate land management file affairs under the description of borders of a city of Armavir - the residential zone intended for perspective town-pl
Actual use Agricultural
Availability of buildings, structures, constructions The site is free from building
Authorizations, urban planning documentation A general layout of Armavir with the project of the city line, confirmed by the decision of Armavir municipal duma ¹ 664 from 18.02.2010.
Information about the proprietor (legal owner) of the ground area
Proprietor The North Caucasian experimental station of the All-Russia scientific research institute of mechanisation of agriculture
Legal owner The North Caucasian experimental station of the All-Russia scientific research institute of mechanisation of agriculture Termless using. Official actÀ-Ò ¹ 247503, The certificate on the right of termless using the earth ¹ 513 from 10.12.1992
Kind of rights Constant termless using The decision of the head of administration of Armavir of Krasnodar region ¹1884 from 04.10.1996. «About the statement of the plan of borders of land tenure of the municipal enterprise of industrial management «Water canal »on
Information about burden
Kind of burden, restrictions Termless using of the North Caucasian experimental station of the All-Russia scientific research institute of mechanisation of agriculture
Area of burden 600 000
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply Air-track – 6-10 kW 43 Connection according specifications of «Armavirenergoinvest»
Gas supply D=108 mm On the border of the site. Connection according specifications of «Armavirgorgas»
Water supply 2D=200 mm 520 m Connection according to specifications of GUP KK «Northeast operating company «Kurganinsky group waterpipe»
Water drain D=200 mm 2 000 According to specifications of GUP KK «Northeast operating company «Kurganinsky group waterpipe»
Installation of telephones - Connection according specifications of OPEN SOCIETY "UÒÊ".
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) 73,0
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union The central part of Armavir 5,2
Center of the subject of federation Krasnodar 250,0 km
Highways (regional, federal value) FAD "Caucasus" On site borders
Highways of local value «An entrance to Armavir» 4,3 km
The nearest railway station Railway station. "Armavir-1" Railway station. "Armavir-2" 2,3 km 6,2 km
Nearest tracks - 4,5 km
Airport Airport Krasnodar 200 km
Seaport Novorossiysk 360 km
The additional information about ground area
Special conditions -
Cost of rent/repayment of ground area (million rubles) 0,603 / 6,6
Notes 1. The given investment project is strategically important for ÌÎ the city of Armavir. In case of interest of the investor the given investment project administration of municipal formation will render assistance in removal charges. 2. The ground