Fast raise house building

Basic information about ground area
The planned use of land Fast raise house building
Location of the project Armavir Ñity
Address of the location Armavir, North house building
Cadastral number of quarter 23:38:01 19 001
Area of the declared (ì2) 500 000
Category of the earths Grounds of settlements
Kind of permitted use Middle floor multiroom apartments in 2-4 floors, individual low to 3 floors apartment houses.
Actual use Agricultural activity
Availability of buildings, structures, constructions The site is free from building
Authorizations, urban planning documentation The land tenure and building rules confirmed by the Decision of the Armavir municipal duma «About the statement of rules of land tenure and building of municipal formation Armavir», from 22/5/2009 ¹567. - A general layout of Armavir with the project of the city line, confirmed by the decision of Armavir municipal duma ¹ 664 from 18.02.2010.
Information about the proprietor (legal owner) of the ground area
Proprietor Russian Federation
Legal owner Municipality
Kind of rights State property to differentiation of the rights
Information about burden
Kind of burden, restrictions Absent
Area of burden -
The characteristic of existing engineering infrastructure
Kind of infrastructureCapacity, diameterDistance to a connection point (m)
Electrical supply Transformer station «Òåplichnaya» – 110/0,4 kv, According to Open Society "Àrmavirenergoinvest" specifications from 12.11.2008. Installation on substantion 110/10 kv «Òåplichnaya» of three cells 10kv, building from them an air-line 10kv under the ring scheme with building of five-six transfor
Gas supply D=273 400 Connection according to Open Society "Armavirgorgas" specifications.
Water supply D=500,0 mm According to specifications of GUP ÊÊ «Northeast operating company«Kurganinsky group waterpipe» from 12.11.2008ã. ¹ 16/4356: Planned and to construct water conduit D=500 mm from water conduit D=800mm of the top zone of a city on street of Efremova
Water drain D=800 According to of GUP ÊÊ «Northeast operating company«Kurganinsky group waterpipe» from 12.11.2008ã. ¹ 16/4356: To make reconstruction of treatment facilities of the water drain of Armavir
Installation of telephones - Connection according specifications of OPEN SOCIETY "UÒÊ".
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) Water supply:72,5 The water drain of sewage:10,3 Electrical supply:24,0 Heat supply:62,15 Gas supply:50,0 Access roads (Cost of a lining of road):167,7
Distance till large settlements and objects of transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal union The central part of Armavir 1,0 km
Center of the subject of federation Krasnodar 250,0 km
Highways (regional, federal value) FAD "Caucasus" 7,8 km
Highways of local value «Armavir - Otradnaya» On site borders.
The nearest railway station Railway station. "Armavir-1" Railway station. "Armavir-2" 2,3 km 5,4 km
Nearest tracks - 1 300,0m
Airport Airport Krasnodar 200 km
Seaport Novorossiysk 360 km
The additional information about ground area
Special conditions -
Cost of rent/repayment of ground area (million rubles) 5,024 / 50,2
Notes The ground areas are given from the auctions, the rent cost pays off at market cost