Basic information about ground area |
The planned use of land |
Transport-logistical complex |
Location of the project |
Armavir Ñity |
Address of the location |
Armavir, North industrial zone |
Cadastral number of quarter |
23:38:03 03 000 |
Area of the declared (ì2) |
25 000 |
Category of the earths |
The earths of an agricultural purpose. (The category will be changed after the statement by Federal agency of a cadastre of objects of the real estate land management affairs under the description of borders of Armavir). |
Kind of permitted use |
Agricultural use (temprorary) |
Actual use |
Agricultural activity |
Availability of buildings, structures, constructions |
The site is free from building |
Authorizations, urban planning documentation |
A general layout of Armavir with the project of the city line, confirmed by the decision of Armavir municipal duma ¹ 664 from 18.02.2010. |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
Property of Open Company ÑPF "Ubilejnoe-Kavkaz" |
Legal owner |
Property of Open Company ÑPF "Ubilejnoe-Kavkaz" |
Kind of rights |
Property |
Information about burden |
Kind of burden, restrictions |
Property of Open Company ÑPF "Ubilejnoe-Kavkaz" |
Area of burden |
25 000 m2 |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
Air-track – 110 kW |
on the side borders Connection according to Open Society "Armavirenergoinvest" specifications. |
Gas supply |
D=219 |
370 Connection according to Open Society "Armavirgorgas" specifications. |
Water supply |
D = 400 |
370 Connection according to SVVUK «Kurganinsky group water conduit». |
Water drain |
D = 300mm |
Along the side borders Connection according to specifications SVVUK «Kurganinsky group water conduit». |
Installation of telephones |
- |
Connection according specifications of OPEN SOCIETY "UÒÊ". |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
- |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
The central part of Armavir |
3,5 km |
Center of the subject of federation |
Krasnodar |
250 km |
Highways (regional, federal value) |
FAD "Caucasus" |
6,3 km |
Highways of local value |
«Armavir - Otradnaya» |
1,5 km |
The nearest railway station |
Railway station. "Armavir-1" Railway station. "Armavir-2" |
4,2 km 5,6 km |
Nearest tracks |
- |
100,0 m |
Airport |
Airport Krasnodar |
200 km |
Seaport |
Novorossiysk |
360 km |
The additional information about ground area |
Special conditions |
- |
Cost of rent/repayment of ground area (million rubles) |
0,251 / 2,5 |
Notes |
1. The given investment project is strategically important for Armavir. In case of interest of the investor the given investment project administration of municipal formation will render assistance in removal charges. 2. The ground areas are give |