Basic information about ground area |
The planned use of land |
The enterprise for processing of a waste of furniture manufacture |
Location of the project |
Abinskiy district |
Address of the location |
northern outskirts of Holmskoy |
Cadastral number of quarter |
23:01:0904013 |
Area of the declared (́2) |
10000 |
Category of the earths |
land settlements |
Kind of permitted use |
enterprise |
Actual use |
Pasture |
Availability of buildings, structures, constructions |
on the plot line of 35 kV |
Authorizations, urban planning documentation |
land use and insure Kholmsk rural settlement |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
The state ownership is not differentiated |
Legal owner |
Administration of Abinsky District |
Kind of rights |
not registered |
Information about burden |
Kind of burden, restrictions |
on the plot line of 35 kV |
Area of burden |
1000 m2 |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
the section of 35 kV |
- |
Gas supply |
high-pressure |
1000 |
Water supply |
Rural water supply |
1500 |
Water drain |
no |
local treatment facilities |
Installation of telephones |
- |
1000 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
3,5 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
city Abinsk |
25 |
Center of the subject of federation |
city Krasnodar |
60 |
Highways (regional, federal value) |
The highway Krasnodar - Novorossisk |
2 |
Highways of local value |
Aren’t present |
Nearby |
The nearest railway station |
Abinsky-linear |
27 20 |
Nearest tracks |
Krasnodar-Novorossisk |
0,2 |
Airport |
Krasnodar, Anapa |
70, 80 |
Seaport |
Novorossisk, Temryuk |
90, 130 |
The additional information about ground area |
Special conditions |
dominant wind direction: NE and SW Seismicity – 8 points |
Cost of rent/repayment of ground area (million rubles) |
Rent – 1,15 rbl. / sq. m |
Notes |
- |