Basic information about ground area |
The planned use of land |
Motel |
Location of the project |
Abinskiy district |
Address of the location |
south-eastern outskirts of the Abinsk |
Cadastral number of quarter |
23:01:0506035 |
Area of the declared (́2) |
25000 |
Category of the earths |
Agricultural land |
Kind of permitted use |
regulation is not set |
Actual use |
Pasture |
Availability of buildings, structures, constructions |
are absent |
Authorizations, urban planning documentation |
land use and urban settlements insure Abinsk |
Information about the proprietor (legal owner) of the ground area |
Proprietor |
The state ownership is not differentiated |
Legal owner |
Administration of Abinsky District |
Kind of rights |
not registered |
Information about burden |
Kind of burden, restrictions |
No |
Area of burden |
- |
The characteristic of existing engineering infrastructure |
Kind of infrastructure | Capacity, diameter | Distance to a connection point (m) |
Electrical supply |
Substation 35 kV |
2000 |
Gas supply |
high pressure gas pipeline |
100 |
Water supply |
gorvodoprovod |
2000 |
Water drain |
no |
local treatment facilities |
Installation of telephones |
- |
1000 |
Cost of maintenance of the ground area an engineering infrastructure (Million rbl.) |
10,7 |
Distance till large settlements and objects of transport infrastructure |
Remoteness from | The name | Distance (km) |
Center of municipal union |
city Abinsk |
- |
Center of the subject of federation |
city Krasnodar |
80 |
Highways (regional, federal value) |
The highway Krasnodar - Novorossisk |
0,5 |
Highways of local value |
Aren’t present |
Nearby |
The nearest railway station |
Abinsky-linear |
3 7 |
Nearest tracks |
Krasnodar-Novorossisk |
5 |
Airport |
Krasnodar, Anapa |
100, 60 |
Seaport |
Novorossisk, Temryuk |
70, 110 |
The additional information about ground area |
Special conditions |
dominant wind direction: NE and SW Seismicity – 8 points |
Cost of rent/repayment of ground area (million rubles) |
Rent – 10,66 rbl. / sq. m |
Notes |
approved a new master plan Abinsk urban settlement, according to which the land, will go down in the border settlement, but now the border Abinsk urban settlements in the process of adjustment |